Plugging with pressure plugging belt is a quick plugging technology. Generally, the process and steps of using pressure plugging belt are as follows:
1. When encountering the leakage medium splashing around, the first thing to do is to clean up around the leakage point.
2. Water leaks can be tied directly, oil and gas leaks should be paved with rubber pads at the leak, and if it is acid, alkali and benzene leaks, chemical film needs to be paved at the leak.
3. The pressure plugging belt along the leakage point side begins to bind tightly and wrap forward. During the binding period, it has been tightened and do not let go, so repeatedly until the leakage is blocked.
4. After tightening and binding, because the pressure plugging belt is elastic contraction, the purpose of leakage stop is achieved under the action of extrusion pressure, and the formation of curing reaction.
5. If it is necessary to increase the plugging strength, it is necessary to strengthen the curing agent repeatedly on the binding surface after the pressure plugging belt, to cover the surface and the circumference.