Repair works in pipeline
Characteristics and applicability of repair in pipeline
Corrosion resistance of nonmetals;
Self-pressure: bare pipe pressure 1.6MPa, sea breaking pressure 4.8MPa;
Applying L fast: applying 1 speed seat 300-400 m/h;
Over elbow: One pass R 5D elbow (90 ")
Caliber bright: Repair pipeline DN50-DN1200:
Long distance: according to the needs of the project, the maximum distance of 100 lines in one construction is 5km;
Main applications: oil field high pressure corrosion pipeline repair, municipal water supply pipeline renewal, heat pipeline renewal, industrial and mining water supply pipeline repair, gas pipeline repair or pressure boost transformation.
The construction process is divided into 8 steps, among which there are 3 key points
01. Pipeline evaluation; Preparation for construction
02. Pigging line sweeping
03. Test the pressure and fill the leak
04. Operate pit excavation and section pipe
05. Test pull test
06. Traction penetration
07. Pressure recovery; Joint treatment
08. Pressure test acceptance put into operation
Pipe structure and performance evaluation, the structure of the composite hose used in this technology
(Refer to product standards: FM211-1999, UL219-1-2006, BS16391, NFPA1961-2013, GB6246-2011, AP115S)